Interior Painting Wayland, MA
What We Did
- Removed all the existing wallpaper and glue on walls in the whole house
- Prep walls for paint
- Paint everything!
This is one of the oldest houses we have ever worked on. It was built in 1732!
Needless to say, the walls were not in perfect condition.
The wallpaper throughout the house was removed with the exception of the living room.
There were 11 rooms total and the walls needed a lot of work.
All the glue was removed with the wallpaper, then it was time to patch.
We had an assembly line of painters working; a few were patching and skim-coating the walls, the others were sanding and then priming.
The next step was painting! The customer picked some great colors which really changed the dynamic of the rooms.
We painted almost everything in the house, from mantels, dentals, crown moldings, wainscots, baseboards, shelves, cabinets, and walls. It was a lot of work, but the end result was terrific.
The other challenge of this project was the time line. We had to complete the project within a tight time frame so the customer could move in. We had up to 5 painters working at a time for about 7 long days.
After many long days of removing wallpaper, prepping walls and painting, the project was done and the customer was very happy. They were able to move in on time into a freshly painted house!